You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Show a compact completed-agent handoff without reopening the full timeline #30
A requester should see what an agent delivered, what was verified, and what remains blocked without reconstructing the answer from a long room or run timeline.
Bounded v1
Reuse existing persisted task, agent-run, evidence, output, verification, and status data; do not invent a second job protocol.
Render one compact completion card in Tasks and the related room timeline.
Show disposition, concise outcome, requested outcome, verification summary, bounded authorised artifact/evidence links, blocker, completion time, and View full timeline.
Fall back to the existing generic run result when legacy/malformed/incomplete data cannot satisfy the card contract.
Treat agent output as untrusted evidence and sanitise all text/links.
Acceptance criteria
Completed, partially completed, failed, cancelled, and blocked runs have truthful distinct summaries.
The card never claims verification without persisted verification evidence.
Artifact/evidence links are organisation-scoped, authorised, bounded, and safe.
Malformed, oversized, stale, or mismatched result data falls back safely.
Full append-only timeline remains available from one clear action.
Unit tests cover disposition reduction, bounds, sanitisation, fallback, and tenant scope.
Browser tests cover successful, blocked, failed, and unauthorised synthetic runs.
Effort guardrail
Presentation/projection slice over existing records. Any missing durable result schema becomes a separate prerequisite rather than hidden scope.
Public amd64 image deployed and live-tested: ghcr.io/jusso-dev/muster:sha-9ad9388@sha256:72bb62a5c5413d9edd000bab4be57f62fc508956b32cf1a90e9550c6c3805f09
Runtime health, zero restarts, preserved PostgreSQL counts, rollback assets, and operator handbook verified.
Activity
jusso-dev commentedon Jul 26, 2026
Implemented and deployed in 9ad9388.